Project Details
Complete mechanical erection of 136 MW Gas Turbine Power Plant Project at Bhikki, District Sheikhupura comprising of unloading and erection of gas turbine and generators with auxiliary equipment weighing single unit of 75 tons with allied equipment like gas / air compressors, pumps, piping (water, air , gas & fire water) instruments with supply, fabrication and erection of pipe racks, stack, steel structure, shed, storage tanks for fire water / raw water including sand blasting, painting and insulation, complete with testing and commissioning as sub-contractor of TIC International, USA for PPR a joint enture company of Associated Group Pakistan and Walter Power USA.