Project Details
Construction of Piping Relocation from Underground to Aboveground at Machike and Keamari Installation and Pumps Replacement Project at Machike
Installation the job includes construction of RCC pipe trench (Pre-Cast Sections) and heavy load bearing steel grating , relocation of buried pipeline with retrieval of product from existing pipeline, degasification, hot / cold tie in , surface preparation and epoxy painting.